Steps for Agreement Creation :
1.
Down load PO
2.
Read PO
3.
See that the following things are
there
a.
School name and stamp should be
same if not give priority to stamp.
b.
If stamp not taken on PO then
consider school name [As per mentioned in PO] for agreement creation.
c. Authorized signatory person should
be as per PO only [the stamp on PO should have a designation on PO for signing
authority][if not matches not call to BDM].
School Address: School
address mentioned in PO need to update in CRM first then proceed further
[Preference given to Letter head].
Pin code of the school
should be corrected [unique] because if we mention wrong code then it will
affect to implementation team for material dispatchment.
d.
Update the affiliation of the
school in the system.
e.
If school details given in the PO
like No. of Students & fee per students then update the same thing in the
CRM in school details section.
f.
If cheque is uploaded along with
the PO then update the cheque details in PO screen & make a receipt in the
system.
g.
When cheque is on Sent status in advance details section
then marked as To be deposited with
the help of created receipt.
h.
Set the H/w details [Computer
systems] **Need to add freight & cable in each cases
i.
Now click on create edit/create
agreement option
j.
Fill the authorised person name,
due date, jurisdiction & replacement time for UPS and Projector lamp.
k.
Recreate the PS
l.
Export the excel to align with
JFM/AMJ/JAS/OND
i.
Make sure that deal value/h/w
value/ servicing are same even after the alignment.
m. Submit.
n.
Change the Status after creating an
agreement
Flow Chart :
PO approved
Editing of
the School done according to the PO (School Name,Address,Pincode)
Proceed
Check for
kind of deal (SN/TN,Assistant,periodicity,outright/ EMI,)
Cheque details filled or not
If cheque
collected -----> not----->Call
Yes
Generate
receipt
Check for Hardware details (specially
Freight cable,White board /combo)
If special commitment by BDM
Check Approval
If Approved (Also read the comments
written by PO owner)
Calculate the total Hardware cost (Verify
properly)
Go to create agreement
Look for
any editing required in Authorized signatory name ,UPS and Projector bulb)
Set the
Payment schedule( Monthly,Bimonthly,Quarterly) or any special requirement like Step up/down model
Submit
If 2
PO’s by same school then look for Aligning the PS
If Chain school then Follow mother and
child concept
